Where should I begin when there are several possible machines?

Identify the operation and send the part drawing. Material, dimensions, thread form and output will help narrow the discussion to configurations relevant to your work.

Does a listed capacity define the whole supply package?

Capacity is one part of the specification. Tooling, holding, accessories and installation requirements should also be confirmed in the quotation.

How do I send a shortlist rather than a single product?

Use the Quote List to collect machines and available options. Review quantities and complete the details form at the end of that process.

Can I discuss a thread without a finished sample?

A dimensioned drawing with the complete thread designation is useful. Include the intended material and any inspection requirements so the application can be assessed.

What should I include for a machine going overseas?

State the destination, electrical supply and installation arrangements. Add any training, documentation or spare-part requirements to the same enquiry.

How long has IMC been established?

Industrial Machinery Corporation was established in 2010 and is based in Ludhiana, Punjab, India.